Navigation

  • index
  • next |
  • previous |
  • Automation Builder Documentation V0.0.0.1 »
  • IEC 61131-3 editor »
  • Programming for PM5xy »
  • <no title> »
  • IEC 61131-3 editor Development System »
  • Introduction »
  • We Write a Little Program »

Previous topic

We Write a Little Program

Next topic

Controlling a Traffic Signal Unit

Quick search

Controlling a Traffic Signal Unit¶

  • Controlling a Traffic Signal Unit
  • Create POU
  • What does TRAFFICSIGNAL do?
  • What does WAIT do?
  • What does SEQUENCE do?
  • What does PLC_PRG do?
  • TRAFFICSIGNAL simulation
  • “TRAFFICSIGNAL” declaration
  • “TRAFFICSIGNAL” body
  • Connecting the standard.lib
  • “WAIT” declaration
  • “WAIT” body
  • “SEQUENCE” first expansion level
  • Create a SFC diagram
  • Actions and transition conditions
  • “SEQUENCE” second expansion level
  • The result
  • PLC_PRG
  • TRAFFICSIGNAL simulation

Navigation

  • index
  • next |
  • previous |
  • Automation Builder Documentation V0.0.0.1 »
  • IEC 61131-3 editor »
  • Programming for PM5xy »
  • <no title> »
  • IEC 61131-3 editor Development System »
  • Introduction »
  • We Write a Little Program »
© Copyright 2017, ABB Automation Products GmbH. Created using Sphinx 1.6.2.