Multiple Define

Command ‘Project’ ‘Data Base Link’ ‘Multiple Define’

Use this command if you want to assign several objects at a single blow to a certain data base category. The dialog ‘Properties’ will open like described for command ‘Define’. Choose the desired category and close the dialog with OK. After that the dialog ‘ENI-Selection’ will open, listing all POUs of the project which are considered for the chosen category (Example: if you choose category ‘shared objects’ then the selection window will only offer the POUs of the Resources tab). The POUs are presented in a tree structure complying to that of the Object Organizer. Select the desired POUs and confirm with OK.